Strip-out to snagging under one contract. We coordinate every trade, hold one programme and hand over a finished home — not a list of loose ends.

Restored Victorian hallway with painted staircase and encaustic tiled floor

In short

What does a full housing renovation include?

A full housing renovation covers every trade needed to take a property from strip-out to handover: survey, structural alterations, plumbing and heating, rewiring, plastering, joinery, kitchens, bathrooms and decoration. MJ Site Solution runs it under one contract, one dated programme and one point of contact, with certificates issued at completion.

Last reviewed

Coverage
London and the South East
Pricing
Fixed, itemised quotation after survey
Certification
Part P electrical, gas safety, building control
Typical duration
8–20 weeks depending on scope

Scope

What is included.

  • Measured survey and scope of works
  • Strip-out, waste removal and site protection
  • Minor structural alterations and making good
  • Full plumbing and heating installation
  • Rewires, lighting and certification
  • Plastering, joinery and decoration
  • Kitchens and bathrooms supplied and fitted
  • Final clean and documented handover
Measured survey and scope of worksStrip-out, waste removal and site protectionMinor structural alterations and making goodFull plumbing and heating installationRewires, lighting and certificationPlastering, joinery and decoration
Measured survey and scope of worksStrip-out, waste removal and site protectionMinor structural alterations and making goodFull plumbing and heating installationRewires, lighting and certificationPlastering, joinery and decoration

Delivery

How we deliver it.

Restored London Victorian terraced house with new painted sash windows and black front door
Step 01 / 04

Survey & scope

A site survey and a written scope, priced line by line, so there are no assumptions left in the quotation.

25%
Joiner measuring a board in a tidy joinery workshop with stacked timber
Step 02 / 04

Programme

A dated programme with trade sequencing, lead times and a single contact who owns it.

50%
Restored Victorian hallway with painted staircase and encaustic tiled floor
Step 03 / 04

Delivery

Our own trades on site, weekly progress reports with photographs, variations agreed in writing before work starts.

75%
Refurbished Victorian ground floor opened into a new navy kitchen, with oak flooring and restored cornicing
Step 04 / 04

Handover

Snagging walk-round, certificates, warranties and a cleaned property ready to occupy.

100%

Standards & compliance

Works carried out to current Building Regulations. Electrical work certified under Part P; gas work by registered engineers. Certificates issued at handover.

Questions

Full housing renovations: common questions.

  • Most full renovations of a two- to four-bedroom house take between 8 and 20 weeks. The exact programme depends on structural work, lead times for kitchens and windows, and building control inspections. We issue a dated programme with the quotation.

  • Internal renovation work usually does not need planning permission, but it does need to meet Building Regulations. Extensions, loft conversions and work to listed buildings or in conservation areas may need consent. We advise on this at survey stage.

  • Yes. We phase the work room by room, keep essential services running and protect furniture and floors. Some stages, such as a full rewire, are quicker and safer if the property is empty for a short period.